Trim skirting where needed so the tower sits against the wall.
Position against the rear wall, level and plumb. Add packers if needed. Remove the top drawer, pre-drill and countersink the fixing rail, then secure to studs with 40 mm screws.
Using an infill panel?See how to fit and scribe it.
Step 02Cleats
Install Rear and Side Cleats
Mark a level line from the tower top across the walls. Mark studs within 16 mm above it. Fix rear cleats first, then side cleats, with their tops on the line. Use studs or suitable load-rated wall fixings.
Adding a divider?Mark the divider position, allowing 16 mm for the board thickness. Leave this gap between the rear cleats. Use a laser to mark the matching skirting slot, then cut it with a multitool.
Step 03Top Shelf
Install the Top Shelf
The shelf is supplied oversized. Measure front and rear widths, check corners for square, then trim to fit the walls.
Rest on the tower and cleats. Pre-drill and countersink through the shelf along the back and both sides, over the wall cleats. Then use a cordless driver to screw down into the rear and side wall cleats.
If your rear and side walls are out of square, you will need to scribe your top shelf to ensure a perfect, snug fit. How to scribe a top shelf.
Tip:Tight access? Temporarily move the tower or leave a side cleat off. Refit before securing.
Step 04Divider
Install the Divider (If Included)
Slide the divider into the 16 mm slot. If the wall gap exceeds 3 mm, scribe to fit.
Use a laser to set it plumb. Fix one angle bracket at the front (not supplied) to secure the divider to the floor. Pre-drill and countersink down through the top shelf, then use a cordless driver to screw through the shelf into the divider.
Step 05Hanging Rails
Fit the Hanging Rails
Upper fixing holes: 240 mm from the rear wall, 35 mm below the top edge.
Lower fixing holes on the tower and divider: 1040 mm below the tower top, 230 mm from the rear edge.
Mark and pre-drill the holes, then screw the hanging ends in place.
Measure between panels, deduct 6 mm, then cut and fit each rail.
Step 06Finish
Clean Up and Gap Fill
Wipe away dust. Caulk small gaps where fixed panels meet walls. Smooth the bead and wipe off excess.
Tip:Leave adjustable shelves and moving parts free of caulk.
Step 07Complete
Your Wardrobe Is Ready
Enjoy your custom wardrobe! Simply clean up with a towel and allow at least 24 hrs for caulking to cure before using!
Wall stud anchoring: Always fasten towers securely into timber wall studs or solid masonry. Do not rely on hollow plasterboard anchors alone for full-height cabinetry supporting heavy hanging clothes and loaded drawers.
Important installation recommendation
Drawer units and shelf towers arrive pre-assembled. Installation requires suitable tools and experience with measuring, trimming, levelling and secure fixing. We recommend arranging an experienced installer. Hanging rails are supplied at 3 m to be trimmed on-site. Angle brackets, screws, wall and floor fixings, and tools are not included. Choose fixings suited to your wall and floor substrate.
Need installation?Reach out to usand we'll point you in the right direction.